Hamburg.deHamburg ServiceResults for "Abfallwirtschaft"

70 Services found for "Abfallwirtschaft"

Research centers for biowaste

Would you like information on the quality requirements of inspection bodies within the framework of recycling management/waste laws?

Apply for proof of collective disposal

Are you subject to the obligation to provide evidence for hazardous waste and do not want to take part in the electronic verification process? Then you can organize disposal using a collective disposal certificate from a carrier.

City cleaning complaint

Are you looking to make a complaint about Hamburg's city cleaning department?

Apply for a waste disposal number

In order to clearly assign your waste disposal sites, you must provide the establishment numbers issued by the responsible authority.

Submit proof of disposal using the privileged procedure

Under certain conditions, you can use the privileged procedure for your disposal certificate.

Show the start of a waste management activity

If you want to collect, transport or trade in waste, you must notify the competent authority of this activity.

Apply for a waste producer number

In order to clearly assign your waste production sites, you must indicate the establishment numbers issued to you in all waste law procedures. You must apply for the company numbers from the responsible authority.

Officially confirmed proof of disposal has been received

Are you subject to the obligation to provide proof of hazardous waste and must have proof of disposal approved? Then, under certain conditions, you will need an officially confirmed proof of disposal.

Submit proof of collective disposal using the privileged procedure

Under certain conditions, you can use the privileged procedure for your collective disposal certificate.

Apply for a waste transport permit

You need a permit to collect and transport hazardous waste.

burning garden waste

You are not allowed to burn garden waste such as leaves or branches, or wood scraps such as pallets or lumber. Use environmentally friendly disposal methods.

Collecting recyclable materials from private households commercially or non-profit

If you wish to collect non-profit or commercially recyclable waste, so-called recyclable materials, from private households, you must notify the responsible authority.

Waste and disposal - electronic waste detection procedure (eANV)

Since April 1st, 2010, the electronic waste verification procedure with a qualified electronic signature of the parties involved has been mandatory as verification procedure for the disposal of hazardous waste.

Apply for an exemption from the submission of an emission declaration for landfills

If you, as the operator of a landfill, are obliged to submit an emissions declaration, you can be exempted from the obligation to submit an emissions declaration under certain conditions.

Apply for appointment as an expert for long-term storage in accordance with the Landfill Ordinance

If you want to work as an expert or expert for long-term storage in accordance with the Landfill Ordinance, you must be appointed to do so by the responsible authority.

Cross-border shipments of waste

Waste shipments to third countries - find out more here.

Apply for a permit for a waste management activity

If you want to collect, transport or trade in hazardous waste, you must apply for a permit for this activity from the competent authority.

Apply for exemption from the obligation to provide proof and register maintenance for those involved in waste management

If you dispose of waste or are involved in disposal processes for which you have to keep evidence and a register, you can apply to the responsible authority for an exemption from this obligation to provide evidence or register.

View community or commercial waste collections

Would you like to collect usable waste, so-called recyclables, from private households for non-profit or commercial purposes? Then you must report this to the responsible authority before starting your collection.

Waste and Disposal - Waste Management

As the highest state waste authority, the Waste Management Department of the Authority for the Environment, Climate, Energy and Agriculture ensures disposal safety and cleanliness in Hamburg.

Dispose of energy-saving lamps and LEDs

Only return energy-saving lamps and LEDs to approved collection and return points. Do not dispose of energy-saving lamps and LEDs in the household waste bin.

Waste and disposal - recycling of valuable materials

You will receive information on recycling and effective waste prevention measures.

Waste and Disposal - Issuing permits for collectors, carriers, dealers and brokers of hazardous waste

(Hamburg) You must apply for a license to transport, collect, trade and broker hazardous waste for commercial purposes.

Disposal of hazardous waste outside of the northern German region, special permit

Do you need an exemption for the disposal of hazardous waste?

Waste and Disposal - Waste Management Plans

You can view the waste management plans of the waste management department of the Free and Hanseatic City of Hamburg.

Waste and Disposal - Waste Officers

A waste officer or company officer for waste advises the entrepreneur or operator of a plant and the employees in all matters that have to do with recycling management and waste disposal in the company.

Detection procedure for the disposal of waste

The disposal of hazardous waste is subject to verification. If you want to know more about it, please read on.

Waste and Disposal - Ship Waste

In the Port of Hamburg you will receive the right solutions for your ship to dispose of oily residues, ship waste water, chemicals and solid waste.

Approval of take-back systems for used sales packaging - dual systems

Systems for taking back sales packaging must be approved by the competent Supreme Waste Management Authority.

Clean City - Hamburg Clean City (BUKEA)

Report any pollution or contamination to the city.

Waste and Disposal - Advice on disposal of hazardous waste

You can get advice on the disposal of hazardous waste. You will receive information about suitable waste disposal facilities, possible disposal routes and necessary documentation.

Apply for information from the water book

The water register is a register of water rights. Anyone can view the water register.

Announcement of experts for safety tests according to the Federal Immission Control Act

Would you like to have the start of work announced as an expert organization for safety tests according to the Federal Immission Control Act? Application for notification of experts and bodies according to the notification ordinance.

Dispose of medications

Dispose of medicines that you no longer need in the residual waste - household waste. Do not dispose of medicines in the toilet.

Show appointment of an emission control officer

If you have newly appointed or dismissed an emissions control officer or if there have been changes in his or her area of responsibility, you must report this to the responsible emissions control authority.

Decommissioning of a genetic engineering facility

As an operator, you must notify the responsible authority of the closure of a genetic engineering facility.

Show commissioning of a crematorium

If you want to operate a crematorium, you must notify the responsible immission control authority that the cremation system has been put into operation.

Report the relocation of genetic engineering work to another approved facility

You can carry out genetic engineering work that has already been approved in another approved facility that you also operate. You must inform the responsible authority of this.

Report changes to safety-relevant facilities and precautions at a genetic engineering facility

As an operator of genetic engineering facilities, you must inform the responsible authority of any changes to safety-relevant facilities and precautions.

Report a change to a facility requiring approval

If you wish to make a change to a facility for which you have not yet applied for approval, you must notify the responsible authority.

Display incident-relevant changes to an operating area in advance

Do you want to change an operating area according to the Major Accident Ordinance or a facility in the operating area that is relevant to major accidents? Then you must notify the responsible authority.

Apply for approval for the construction and operation of plants

If you want to set up or operate systems that can damage the environment to a particular extent or endanger the general public, you need a permit.

Indicate in advance the construction of an operating area relevant to an incident

Do you want to set up and operate an operating area in accordance with the Major Accident Ordinance? Then you must notify the responsible authority.

Apply for approval for a major accident-relevant change to a facility requiring approval

If you want to make important changes to a facility that requires approval, you will need approval

Apply for a partial permit to construct and operate a facility requiring a permit

If you want to set up or operate a part of the plant that can damage the environment to a particular extent or endanger the general public, you need a partial permit.

Report facility requiring approval for the first time due to change in law

If you are building or have built a facility and this facility requires approval due to a change in the law, you must notify the responsible authority in a timely manner.

Apply for approval to modify a plant for generating electricity from renewable energies (repowering)

If you intend to make changes to a plant that generates electricity from renewable energy sources and requires a permit, you must apply for a permit from the responsible authority.

Facade cleaning Report wastewater discharge

If you want to clean a facade with a high-pressure cleaner, you must report this.

Apply for a permit to build and operate genetic engineering facilities

If you wish to set up and/or operate a facility to carry out genetic engineering work at safety levels 3 and 4, you will need a permit from the competent authority.

Submit emissions declaration according to 11th BlmSchV

As the operator of certain systems that require approval, you are obliged to declare the air emissions emitted by your systems.

Apply for a permit using the simplified procedure for a plant under the Federal Immission Control Act

Are you applying for approval of installations using the simplified procedure? You can then obtain a permit from the competent authority to construct and operate facilities of a certain type or size without public participation.

Report safety report of upper class operating areas according to Major Accident Ordinance

New or updated safety reports from upper class operating areas must be submitted to the responsible authority for review.

Submit a measurement report on continuous measurements of air pollutants at cremation facilities

As an operator of a cremation facility for human corpses, you must continuously determine the air pollutant emissions for certain air pollutants through continuous measurements.

Registration of evaporative cooling systems - protection against legionella

Obligations for operators of evaporative cooling systems, cooling towers and wet separators

Education and training institutions in accordance with the Chemicals Climate Protection Ordinance, recognition

You would like to be recognized as a training and further education institution in accordance with the Chemicals Climate Protection Ordinance.

Apply for a preliminary decision on a facility that requires a permit

If you apply for a preliminary decision regarding a facility requiring approval, the responsible authority can issue this under certain conditions.

Apply for approval for a significant change to a facility requiring approval

If you plan to make significant changes to a facility that require a permit, you must apply for a permit.

Measurement report on continuous measurements of air pollutants Acceptance at large combustion plants, gas turbines and combustion engine plants

If you operate a large combustion plant, gas turbine or internal combustion engine plant, you must continuously determine, record and evaluate pollutant emissions through continuous measurements.

Report the accident-relevant construction and operation or an accident-relevant change to a facility that does not require approval

If you are planning construction work or changes to a facility that does not require a permit that could be significant for an incident, you must notify us in advance.

Apply for certification of companies according to §6 Chemicals Climate Protection Ordinance

Does your company want to install, maintain, maintain, repair or shut down systems with fluorinated greenhouse gases, as well as check for leaks or recover the gases? Then you need certification from the responsible body.

Submit a measurement report on individual measurements of air pollutants in large combustion plants, gas turbines and combustion engine plants

If you operate a large combustion plant, gas turbine or combustion engine plant, you must have the pollutant emissions checked regularly through individual measurements. You must prepare a measurement report on the results of the individual measurements.

Communicate information to check an increased risk of incidents (domino effect).

The authority is checking whether there could be domino effects in neighboring operational areas. Share information about this with the relevant authority.

Apply for a permit under the accident prevention law for the construction and operation or modification of a facility that does not require a permit

If you construct or make a change to a facility that is part of an operating area and does not require a permit, and which has major accident-related effects, you will need a permit.

Apply for approval for the early construction of a system that requires approval

Have you applied for a permit for a facility that requires a permit? Then you can also apply to start construction of the facility early.

Air pollution control

Without clean breathing air, the human body could only survive for minutes. Our air is therefore a very valuable commodity. Protecting this is the goal of air pollution control.

Apply for recognition as a testing and certification body in accordance with the Chemicals Climate Protection Ordinance

If you want to carry out tests in accordance with the Chemicals Climate Protection Ordinance and issue certificates of expertise, you need approval from the responsible authority.