Authority for the Environment, Climate, Energy and Agriculture
Apply for partial approval for the construction of a facility requiring approval
If you want to set up or operate a part of the plant that can damage the environment to a particular extent or endanger the general public, you need a partial permit.
Important notes
Prerequisites
You will receive a partial permit for the construction and operation of part of a facility if
1. there is a legitimate interest in the granting of a partial license,
2. the approval requirements for the subject of the partial approval applied for are met and
3. a preliminary assessment shows that there are no insurmountable obstacles to the construction and operation of the entire facility with regard to the prerequisites for the permit.
The binding effect of the preliminary overall assessment does not apply if a change in the factual or legal situation or individual tests as part of later partial approvals lead to an assessment that deviates from the preliminary overall assessment.
The conditions for approval are:
1. the legal obligations based on the Federal Immission Control Act and
the statutory ordinances on requirements for systems requiring approval are met and
2. Other public law regulations and occupational safety issues do not conflict with the construction and operation of the system
Documents required
- written or electronic request
- drawings, explanations and other documents required to check the approval requirements
- Baseline report
Please note
No
Deadlines
You need approval before you set up or operate the part of the plant or the sub-plants.
Procedure & Fees
Procedure
You submit the application for approval for the construction and operation of systems requiring approval in writing or electronically to the competent authority.
The authority will examine your application.
If necessary, the authority will request further information or documents from you.
The authority publishes the application with the associated documents and makes it public for one month.
The authority asks the other authorities involved to comment on the approval process within one month.
Objections will be discussed with you and those who raised the objections in a public meeting.
In a simplified approval procedure or if public participation is refrained from, there is no public display and no hearing.
The authority decides on your application. If necessary, the authority supplements the notice with content and ancillary provisions.
You will receive a written notification with justification.
Those who have raised objections will also receive the decision with reasons.
Processing time
Not specified
Fees
No
Legal notes
Legal remedies
- Objection within one month of receipt of the decision.
Legal basis
§ 8 Federal Immission Control Act (BImSchG)
URL: https://www.gesetze-im-internet.de/bimschg/__8.html
§ 10 Federal Immission Control Act (BImSchG)
URL: https://www.gesetze-im-internet.de/bimschg/__10.html
§§ 5 - 7 Federal Immission Control Act (BImSchG)
URL: https://www.gesetze-im-internet.de/bimschg/BJNR007210974.html#BJNR007210974BJNG000303360
Downloads & Links
Links on hamburg.de
Links on the Internet
Service description
If you would like to build and operate systems or parts of a system which, due to their nature or operation, are particularly likely to cause harmful environmental effects or otherwise endanger, significantly disadvantage or significantly inconvenience the general public or the neighborhood You have a partial approval from the responsible authority. This also includes stationary waste disposal facilities for storing or treating waste.
Address and contact information
Address
Authority for the Environment, Climate, Energy and Agriculture
Corporate Environmental Protection
Neuenfelder Straße 19 21109 Hamburg
Room: F.04.314
Send email
Phone
Facility info
Accessible |
We have a limited number of customer parking spaces. To reserve a parking space, please contact our receptionist by e-mail at zugang@bsw.hamburg.de or by telephone on +49 40 428 40 - 50 50. Our working hours are: Monday to Thursday from 8:00 a.m. to 3:15 p.m , Friday from 8 a.m. to 1:30 p.m.
Public transport
S3/S31 Wilhelmsburg, Bus 13/151/152/154/156//155/252 Inselpark