Landungsbrücken

Authority for the Environment, Climate, Energy and Agriculture

Determination of the suitability of systems for handling water-polluting substances

If you want to build, operate or significantly change a facility for storing, filling or handling water-polluting substances, you must first submit an application to the responsible authority to determine the suitability of the facility.

Important notes

Prerequisites

Facilities for dealing with water-polluting substances must be designed and constructed, maintained, operated and decommissioned in such a way that a negative change in the properties of water is not to be expected

Documents required

You must include evidence of the suitability of the facility with your application for a suitability assessment. At the request of the responsible authority, you must have an expert report prepared and presented on the suitability of the system. The documents required in each case depend on the individual case and are determined by the responsible authority.

Please note

The determination of suitability is only necessary for storage, filling or handling (LAU) facilities, but not for production, treatment and use (HBV) facilities and pipelines. Further exceptions are regulated by Section 63, Paragraphs 2 and 3 of the Water Resources Act (WHG) and Section 41 of the AwSV.

Deadlines

No. However, you must have the suitability assessment before you start your project. You should therefore submit the application well in advance of the intended start of your project.

Procedure & Fees

Procedure

  • It is recommended that you make preliminary arrangements with the responsible authority before submitting your application.
  • You submit a written, informal application for a determination to the responsible authority
  • With the application you submit evidence that proves the suitability of the system.
  • The responsible authority will check your application for completeness.
  • If necessary, the responsible authority will contact you again and request further documents.
  • The result of the aptitude assessment procedure will be communicated to you in a written notification.

Processing time

The processing time depends on the scope of the application. However, you must expect a processing time of up to several months.

Fees

Depending on the time required, the scope of the application is 150 – 6,000 € EUR

Service description

You may only build, operate and significantly modify a facility for storing, filling or handling substances that are hazardous to water if the suitability of the facility has been determined in advance by the responsible authority.

The suitability assessment serves as a preventive control of the technical design of the system. The suitability assessment is an instrument of official prior control, a “proof of usability” and not a system approval. The test standard is compliance with the principle of concern or the best possible protection as well as the technical rules.

In order to initiate the process to determine suitability, you must submit a written application to the responsible authority.

Enlarge map

Address and contact information

Address

Authority for the Environment, Climate, Energy and Agriculture
Wastewater Management
Neuenfelder Straße 19 21109 Hamburg

Facility info

Mensch in einem Rollstuhl Accessible

We have a limited number of customer parking spaces. To reserve a parking space, please contact our receptionist by e-mail at zugang@bsw.hamburg.de or by telephone on +49 40 428 40 - 50 50. Our working hours are: Monday to Thursday from 8:00 a.m. to 3:15 p.m , Friday from 8 a.m. to 1:30 p.m.

Public transport

S3/S31 Wilhelmsburg, Bus 13/151/152/154/156//155/252 Inselpark

Public Service Disclaimer

Please note: This service on hamburg.com uses machine translations powered by Google. Some content may not be translated accurately or reliably. The translations are constantly being improved. If you have any issues with Google Translate, please visit https://translate.google.com/support.