Landungsbrücken

Authority for the Environment, Climate, Energy and Agriculture

Proof of tightness for property drainage systems

The condition of the private sewage pipes, some of which are several decades old, is often worrying. The property owners are responsible for the tightness of the sewage pipes.

Important notes

Prerequisites

not specified

Documents required

not specified

Please note

Proof of tightness: Property owners are responsible for the tightness of their sewer pipes and systems.
Telephone contact time: Mon, Tue and Thu: 1 p.m. - 3 p.m., Wed and Thu: 9 a.m. - 12 p.m.

Deadlines

There are different deadlines; please refer to this overview .

Procedure & Fees

Procedure

In the case of a new property drainage system, proof of the test for leaks must be carried out in the course of the construction work (pressure test with water or air according to DIN EN 1610). New property drainage systems may only be put into operation when proof of tightness has been provided.

Proof of tightness for existing property drainage systems must be kept by the owners and presented to the authorities on request (§ 17b Paragraph 1 Clause 3 Hamburg Waste Water Act).
In principle, the following applies to residential properties: Proof of tightness must be provided every 25 years, in water protection areas every 10 years.

Processing time

ongoing

Fees

The submission of an audit report is free of charge. The test costs depend on the respective provider of the service and the complexity.

Legal notes

Legal remedies

An objection can be lodged against a decision within one month.

Legal basis

Section 17b paragraph 1 sentence 2 of the Hamburg Wastewater Act

Service description

It is known from various studies both in Hamburg and in other federal states that approx. 30 to over 50% of private sewage pipes are damaged. The total length of private lines nationwide is estimated to be at least twice as long as that of the public network. Apparently, there is a considerable potential for damage to the groundwater as a result of the infiltration of sewage from pipe leaks. This applies to the entire urban area and is a particular problem in water protection areas.

Enlarge map

Address and contact information

Address

Authority for the Environment, Climate, Energy and Agriculture
Wastewater Management
Neuenfelder Straße 19 21109 Hamburg

Facility info

Mensch in einem Rollstuhl Accessible

We have a limited number of customer parking spaces. To reserve a parking space, please contact our receptionist by e-mail at zugang@bsw.hamburg.de or by telephone on +49 40 428 40 - 50 50. Our working hours are: Monday to Thursday from 8:00 a.m. to 3:15 p.m , Friday from 8 a.m. to 1:30 p.m.

Public transport

S3/S31 Wilhelmsburg, Bus 13/151/152/154/156//155/252 Inselpark

Public Service Disclaimer

Please note: This service on hamburg.com uses machine translations powered by Google. Some content may not be translated accurately or reliably. The translations are constantly being improved. If you have any issues with Google Translate, please visit https://translate.google.com/support.