Authority for urban development and housing
Construction site notice
You must notify the authority for urban development and housing, office for building regulations and building construction (ABH 33) of construction sites of a certain size at least two weeks before they are set up.
Important notes
Prerequisites
not specified
Documents required
Evidence for online registration
Please note
Construction sites of a certain size must be announced to the authority for urban development and housing, office for building regulations and structural engineering (ABH 33) at least two weeks before they are set up.
Advance notice is required whenever:
- the expected duration of the work is more than 30 working days and more than 20 employees are working on the construction site at the same time, or
- the scope of the work is expected to exceed 500 man-days (number of workers times number of working days).
Deadlines
no later than two weeks before the construction site is set up
Procedure & Fees
Procedure
You can use this online service to view the construction site advance notice data
- pre-record and then checked by the builder or those responsible within the meaning of Section 4 of the Construction Site Ordinance (BaustellV) and then sent electronically to the Authority for Urban Development and Housing (BSW).
or - record it directly and send it electronically to the authority for urban development and housing (BSW) on behalf of the client or those responsible within the meaning of Section 4 of the Construction Site Ordinance (BaustellV).
Processing time
not specified
Fees
none
Legal notes
Legal basis
§ 2 (2) Construction Site Ordinance (BaustellV)
Downloads & Links
Service description
You must notify the authority for urban development and housing, office for building regulations and building construction (ABH 33) of construction sites of a certain size at least two weeks before they are set up.
Address and contact information
Address
Authority for urban development and housing
Office for building regulations
construction technology, structural engineering and building technology
Nagelsweg 37-39 20097 Hamburg
Send email
Phone
Facility info
Public transport
S3, Hammerbrook
Keywords: Advance notice of a construction site construction site Construction site announcement
Last updated: 28.04.2024