Authority for the Environment, Climate, Energy and Agriculture

Apply for water law permit for groundwater lowering

Would you like to carry out a temporary lowering of the groundwater level on a property? Then please continue reading here.

Important notes

Prerequisites

In certain cases, no permit under water law is required, but the project must be reported (currently still on a form ).
This includes:

  • short-term pumping attempts,
  • Groundwater lowering with a lowering level of less than 1.0 m and a maximum duration of four weeks with open dewatering (auxiliary construction drainage)
  • and small-scale subsidence (e.g. when installing shafts) over a maximum of ten days with small vacuum filter systems,
  • Sampling from groundwater measuring points (not subject to notification).
For the exceptions, please read: Prerequisites for use without a permit

Documents required

Information on the planned lowering measure and an excerpt from the field map / site plan with the entry of the system location (further systems see the form).

Please note

Due to staff shortages, there are currently extended processing times when issuing water law permits for temporary groundwater lowering. The average processing time is currently 3 months. Be sure to plan for this additional time requirement and submit the necessary applications in good time.

Deadlines

Applications for permission to lower the groundwater level should be submitted eight to ten weeks before the start of the measures.


A notification of a minor, temporary groundwater lowering must be received 2 weeks before the start of the measure.

Procedure & Fees

Procedure

ATTENTION: the online reporting service is not intended for the first application, but for subsequent reporting of measured water levels.

Processing time

Status April 2023: currently up to 12 weeks


The notification will be issued as quickly as possible with the usual processing times.

Fees

A one-time administration fee is charged for the processing of applications as part of the environmental fee schedule. This depends on the official work and time involved in processing the application.

Legal notes

Legal remedies

An objection can be raised against a decision within one month.

Service description

Would you like to carry out a temporary lowering of the groundwater level on a property? Then please continue reading here.

Enlarge map

Address and contact information

Address

Authority for the Environment, Climate, Energy and Agriculture
Water Management
Neuenfelder Straße 19 21109 Hamburg

Facility info

Mensch in einem Rollstuhl Accessible

We have a limited number of customer parking spaces. To reserve a parking space, please contact our receptionist by e-mail at zugang@bsw.hamburg.de or by telephone on +49 40 428 40 - 50 50. Our working hours are: Monday to Thursday from 8:00 a.m. to 3:15 p.m , Friday from 8 a.m. to 1:30 p.m.

Public transport

S3/S31 Wilhelmsburg, Bus 13/151/152/154/156//155/252 Inselpark

Public Service Disclaimer

Please note: This service on hamburg.com uses machine translations powered by Google. Some content may not be translated accurately or reliably. The translations are constantly being improved. If you have any issues with Google Translate, please visit https://translate.google.com/support.