Authority for the Environment, Climate, Energy and Agriculture
Infiltration of rainwater - permit-free
Are you interested in the infiltration of rainwater on residential properties? Then please continue reading here.
Important notes
Prerequisites
- No more than 250 m² of paved area is connected to the drainage system.
- The seepage within water protection areas takes place near the surface via seepage troughs or similar.
- The seepage takes place outside of contaminated sites and areas suspected of being contaminated.
- The requirements for harmless seepage from the ordinance are complied with.
Documents required
Plans, descriptions and evidence of the planned project.
Please note the information in the online reporting procedure or in the form.
Please note
Permission is not required
- provided that no more than 250 square meters of paved area is connected to the drainage system
- infiltration outside of Zones I and II of water protection areas
- as well as outside of contaminated sites and suspected contaminated sites, and
- the requirements for harmless infiltration from the ordinance are complied with.
Deadlines
not specified
Procedure & Fees
Procedure
You report your intention to insure rainwater on your residential property online or by correspondence.
Processing time
for you about 10 minutes
Fees
no
Legal notes
Legal basis
§§ 8 and 9 paragraph 1 number 4 and § 10 of the Water Resources Act (WHG).
according to § 85 paragraph 1 of the Hamburg Water Act (HWaG).
Downloads & Links
Forms and downloads
Links on hamburg.de
Service description
Are you interested in the infiltration of rainwater on residential properties? Then please continue reading here.
Address and contact information
Address
Authority for the Environment, Climate, Energy and Agriculture
Water Management
Neuenfelder Straße 19 21109 Hamburg
Room: G.03.317
Send email
Phone
Facility info
Accessible |
We have a limited number of customer parking spaces. To reserve a parking space, please contact our receptionist by e-mail at zugang@bsw.hamburg.de or by telephone on +49 40 428 40 - 50 50. Our working hours are: Monday to Thursday from 8:00 a.m. to 3:15 p.m , Friday from 8 a.m. to 1:30 p.m.
Public transport
S3/S31 Wilhelmsburg, Bus 13/151/152/154/156//155/252 Inselpark
Keywords: Rainwater Precipitation infiltration regulations Permission under water law for the infiltration of rainwater Rainwater seepage ordinance Lowering of groundwater
Last updated: 28.04.2024