The purpose of development plans is to prepare and direct the construction and other use of the land. Development plans regulate, among other things, the construction and non-construction use of the land.
Are you planning changes to an operational area with expanded responsibilities? Learn how to submit the necessary information for external alarm and hazard prevention plans here.
In order to obtain clarity about planning-relevant aspects of a construction project at an early stage, you can apply for a preliminary building permit.
Do you want to put into operation a plant that does not require a permit but uses organic solvents above the threshold values? You can find out how to register this here.
Soil protection is used to secure or restore the functions of the soil. The soil is an indispensable basis of life for nature and society, their development and sustainable usability. Soil cannot be increased and has only a limited load-bearing ...
If you already operate a medium-sized combustion plant, gas turbine, or combustion engine, you must report this to the relevant air pollution control authority.
Hamburg is the core of a dynamic region. The spatial links with the neighboring communities and districts are diverse. Read more about it here and follow the links.
Documentation of the Hamburg telecommunications network according to geographic and thus location-specific aspects. Provision of area-related information about the course of routes and cables in the Hamburg telecommunications network, eg for external ...
If you want to operate a facility that does not require a permit and emits volatile halogenated organic compounds, you can find out how to report this to the responsible authority here.
Hamburg will develop into a growing metropolis with international appeal. The draft for the spatial model specifies the political goals for the field of action of urban development.
Does your plant use volatile organic solvents? Learn more about the conditions under which you must have emissions checked through individual measurements here.
You must notify the responsible authority under certain conditions of any change in the location, condition or operation of a wastewater treatment plant.
If you're planning to commission a medium-sized combustion plant, gas turbine, or internal combustion engine, you can find out how to notify the relevant authority here.
Land use plans are drawn up in order to create a binding legal basis for new building projects, among other things. You too may be affected by the plans. Use your participation rights.
Are you planning an emissions-relevant change to a medium-sized combustion plant, gas turbine, or internal combustion engine? You must notify the responsible emissions control authority.
If you want to permanently shut down a medium-sized combustion plant, gas turbine, or internal combustion engine, you can find out how to notify the responsible authority here.
If you want to sell animals, plants or products of a strictly protected species or use them commercially, you must first apply for a marketing permit from the responsible authority.
If you operate a large combustion plant, gas turbine or combustion engine plant, you must have the pollutant emissions checked regularly through individual measurements. You must prepare a measurement report on the results of the individual measurements.
If you operate a large combustion plant, gas turbine or internal combustion engine plant, you must continuously determine, record and evaluate pollutant emissions through continuous measurements.
Whether it's noise, light, odors, air pollution, or vibrations – official emission control serves to protect the public's environment from harmful environmental impacts. Here you can find out what is regulated and who to contact if you have any problems.
If you want to discharge commercial wastewater into a private wastewater plant or sewer system, you need a permit. Under certain conditions, the competent authority may allow you to start discharging before you have received approval.
Do you operate a waste incineration plant or a combustion plant that burns waste? Learn how to determine pollutant emissions through periodic measurements here.
If you're a specialist company that wants to maintain small wastewater treatment plants, you need a permit. Here you can find information about the process, costs, duration, and required documents.
If you want to infiltrate pre-treated wastewater from a small sewage treatment plant or discharge it into a surface water body, you must apply for a water law permit from the responsible water authority.
Do you operate a waste incineration plant or a combustion plant that co-incinerates waste? Learn how to determine pollutant emissions through continuous emission measurements here.
Do you operate a medium-sized combustion plant, gas turbine, or combustion engine plant? Learn how to submit a measurement report on individual air pollutant measurements here.
Do you operate a biological waste treatment facility? Learn how to submit a report on individual air pollutant measurements to the responsible authority here.
Would you like to discharge commercial wastewater into a private wastewater plant and be exempt from the permit requirement? You must then submit an application for exemption from the approval requirement to the responsible authority.
Do you operate a large combustion plant, gas turbine, or internal combustion engine plant that co-incinerates waste? Learn how to submit the annual information about your plant here.
If you want to change a discharge from a small sewage treatment plant for which you have a water law permit, you must apply to the responsible authority for a permit change.
As the operator of a medium-sized combustion plant, gas turbine or combustion engine plant, you must, under certain conditions, determine pollutant emissions through continuous measurements and prepare a measurement report on the results.
Without clean breathing air, the human body could only survive for minutes. Our air is therefore a very valuable commodity. Protecting this is the goal of air pollution control.
The Stadtwerkstatt organizes and advises the individual citizen participation processes and regularly develops new methods and tools for better citizen participation.
Many areas in Hamburg that are suitable for residential construction are exposed to high loads. Two guidelines on air pollutants and noise deal with land use planning.
Are you applying for approval of installations using the simplified procedure? You can then obtain a permit from the competent authority to construct and operate facilities of a certain type or size without public participation.
If you intend to make changes to a plant that generates electricity from renewable energy sources and requires a permit, you must apply for a permit from the responsible authority.
The Office for Consumer Protection oversees whether the legally required inspections have been carried out on installations requiring monitoring after changes that are subject to inspection.
If you have newly appointed or dismissed an emissions control officer or if there have been changes in his or her area of responsibility, you must report this to the responsible emissions control authority.
Does your plant use volatile organic solvents? Learn more about the conditions under which you must have emissions checked through individual measurements here.
Do you require engineering surveys and consulting on all types of BIM methods (3D laser scanning, evidence preservation measurements, as-built surveys, deformation measurements, staking out, special networks, etc.), primarily for public clients?
Trees and hedges are under special protection in Hamburg. Check here whether you need a permit for clearing, pruning, or other measures, and submit an application directly if necessary.