Construction of property drainage systems

Developed plots of land are to be connected directly (without building encumbrance) to the public sewage system via a separate underground line or via another plot of land (with building encumbrance) using a separate or shared underground line.

Permits under water law for surface waters

If you have drainage problems or questions about drainage in road ditches or the course of drainage pipes, please contact the public space management department of the responsible district office directly. For responsibilities for issuing permits ...

Inspection of property drainage files

If you would like to inspect property drainage files personally, please contact us.

Specialized companies for property drainage systems

Compilation of specialist companies and laboratories

Proof of tightness for property drainage systems

The condition of the private sewage pipes, some of which are several decades old, is often worrying. The property owners are responsible for the tightness of the sewage pipes.

sewage

The municipal sewer system consists of wastewater and rainwater pipes. Both discharges are often combined in a combined sewer. Before reporting a blockage, please make sure that it is not on your property. The property owners are responsible for and ...

Get information on how to reduce damage caused by heavy rain

A team of experts from the environmental agency and Hamburg Water provides information on heavy rain prevention. The aim is to keep the damage that could be caused by heavy rain events in the city as low as possible.

Apply for a permit to discharge wastewater into public wastewater systems

If you want to discharge wastewater (wastewater or stormwater) into a public wastewater plant or sewer system, you usually have to apply for a permit in advance.

Apply for an early start to the discharge of wastewater into private wastewater plants

If you want to discharge commercial wastewater into a private wastewater plant or sewer system, you need a permit. Under certain conditions, the competent authority may allow you to start discharging before you have received approval.

Wastewater permits

On the website you will find forms for the most important water/waste water procedures.

Apply for an early start to the discharge of wastewater into public wastewater systems

If you want to discharge commercial wastewater into a public wastewater plant or sewer system, you need a permit. Under certain conditions, the competent authority may allow you to start discharging before you have received approval.

Apply for exemption from the permit requirement for discharging wastewater into private wastewater plants

Would you like to discharge commercial wastewater into a private wastewater plant and be exempt from the permit requirement? You must then submit an application for exemption from the approval requirement to the responsible authority.

Connection and use compulsory

A new or additional sewer connection requires approval according to § 7 HmbAbwG.

Siel connection commercial

A new or additional sewer connection requires approval according to § 7 HmbAbwG.

Indicate a change in the location, condition or operation of a wastewater treatment plant

You must notify the responsible authority under certain conditions of any change in the location, condition or operation of a wastewater treatment plant.

Apply for a permit to construct, operate or modify a wastewater treatment plant

If you want to build, operate or significantly modify certain wastewater treatment plants, you must apply for a permit in advance.

Sewage disposal in Hamburg

general, overarching information

Calculate and set water abstraction fees

Do you extract water from a surface water body or groundwater, or do you extract or divert groundwater? In this case, you have to pay a fee to the relevant federal state.