Hamburg.com IASON page

Foundation of a day care center

  •  

Detailed description

Facilities in which children are cared for all day or for part of the day require permission from the responsible authority to operate. You, as the operator of the facility, must apply for permission.

If you want to run a daycare center as an independent provider, you must meet certain requirements in order to be granted the relevant permit.

 

Information

Prerequisites

  • The care of the children by suitable staff is guaranteed.
  • The well-being of the children in the facility is guaranteed, in particular by
    • Promoting their social and linguistic integration.
    • adequate health care and medical attention.
    • Fulfillment of minimum structural, personnel and pedagogical-professional standards.

Documents required

  • Identification document
  • Statement from the youth welfare office with the corresponding place allocation
  • Protection concept according to § 45 SGB VIII: A pedagogical concept is a prerequisite for the granting of an operating license. It should reflect the mission statement of the provider as well as the (structural) framework conditions of the facility. It also describes the content-related and professional orientation and thus provides the reason and basis for further professional development.
  • Violence protection concept according to Section 37a SGB VIII (not required if the protection concept according to Section 45 SGB VIII focuses on the special protection needs of children and young people with disabilities)
  • Information on the room program (description of the spatial situation and dimensioned floor plans of the rooms, building section with usage concept, as well as a site plan of the building)
  • Business plan (for private commercial operators)
  • Approval of the change of use by the responsible building authority including fire protection concept

Please note

It is not possible to start operating the day care facility without an operating license. Failure to submit an application on time will result in a delayed opening of the day care facility.

The staff hours specified in the application must correspond to the minimum staffing level. This minimum staffing level must always be guaranteed.

Procedure

  • You submit the application including all required documents to the responsible authority.
  • The specialist consultants at the responsible authority will advise you on the details of the operating permit.
  • The specialist consultants of the responsible authority check the spatial, technical, economic and personnel requirements on site.
  • If the requirements for issuing an operating license are met, the final decision will be made by the responsible authority. You will be informed of the decision in writing.

Processing time

Please allow several weeks for processing.

Fees

 

Legal basis

Section 45 of the Social Code - Eighth Book (SGB VIII)

http://www.gesetze-im-internet.de/sgb_8/__45.html

Find out your responsible facility

Angaben zur Zuständigkeit

Haven't found the right one yet?

To Hamburg Service startpage

Keywords: Founding of a daycare center Establishing a kindergarten After-school care Company kindergarten founded Carrier advice Carrier advice Kita Language training in daycare centers Offensive early chance Daycare allowances Daycare supervision Advice to daycare providers company day-care center

Last updated: 05.02.2025