For the construction, the change (e.g. conversion), the change of use (e.g. conversion of a shop into an apartment) as well as the demolition of buildings and other structures, you usually need a building permit. A complete building application is an...

For the construction, the change (e.g. conversion), the change of use (e.g. conversion of a shop into an apartment) as well as the demolition of buildings and other structures, you usually need a building permit.

A complete building application is an essential prerequisite for a smooth and short process.

Important notes

Prerequisites


The prerequisites for issuing a building permit must be checked in each individual case.

Documents required

Application and building plans.
The specific documents depend on the individual case. Depending on the approval process and project, different documents are required

Please note

Remember that you may still need approvals from other authorities in the simplified procedure. You must check on your own responsibility whether all legal areas of the building regulations and ancillary building laws are being observed.

If you would like to have everything from one source, you should rather choose the concentrated procedure according to § 62 HBauO. We offer you this service there.

A building application may be rejected if the documents are not complete.

There is no longer any telephone consultation. Advice outside of ongoing approval procedures is subject to a fee

Deadlines



If the building application shows significant deficiencies, the district office will be asked to rectify the deficiencies within a reasonable period of time. The deadline depends on the extent of the defects.

Procedure & Fees

Procedure

The building application must be submitted in writing with all the documents (building documents) required for assessing the building project. Different documents are required depending on the approval process and project.
Please note that a building application can be rejected if the documents are incomplete.
If there are any doubts about the general eligibility of the building project, this can be clarified at an early stage with a preliminary building inquiry by means of a preliminary decision.

Processing time

The processing time depends on the scope of the project applied for and the type of procedure selected and can take 1 to 3 months after the required documents have been submitted in full.

Fees

The fees for obtaining a building permit are enclosed


EUR 64.70 minimum fee in the simplified procedure,


EUR 129.40 minimum fee in the concentrated procedure.

Legal notes

Legal remedies

contradiction

Legal basis

§ 59 ff HBauO