Authority for the Environment, Climate, Energy and Agriculture

Submit a measurement report on individual measurements of air pollutants at installations in accordance with the approval notice

Do you operate an industrial or commercial facility that requires a permit? Learn what you need to know about the individual measurements specified in the permit here.

Detailed description

If you wish to operate industrial or commercial facilities that require a permit, the permit notice may stipulate that you must have compliance with limit values for air pollutants checked through individual measurements.


You must usually carry out the measurements on a recurring basis and additionally, if you

  • Your facility has been newly built,
  • put into operation or
  • have changed significantly.
 

Information

Prerequisites

  • You operate a facility that requires a permit.
  • As part of the approval process, it was stipulated that you must have the plant's compliance with limit values for air pollutants verified through individual measurements.
  • You have newly constructed the facility, put it into operation or made significant changes to it.
  • There is an obligation to carry out recurring measurements.
  • You commission an accredited measuring institute or an expert to carry out the measurement.

Documents required

  • Approval notice
  • Complete measurement report with information on:
    • measurement planning
    • the result of each individual measurement
    • the measurement method used
    • Operating conditions that are important for the assessment of the measurement results

Please note

  • The measurement report must comply with Annex A of the guideline VDI 4220 Part 2 (2018 edition).
  • If you fail to carry out officially ordered measurements, or if you do so incorrectly, incompletely, or late, you are committing an administrative offense, which can be punished with a fine.

Deadlines

Submit the measurements and the measurement report within the deadline specified in the approval notice.

Procedure

  • You have received a permit for your system in which individual measurements are specified by the authorities.
  • You contact an accredited (notified) measuring body or an expert, provide the information required for the measurement and arrange a measurement appointment.
  • The measuring body or the expert then prepares the measurement plan and reports it to the responsible body together with the measurement date.
  • At the measurement date, the emission values of your system are determined and compared with the emission values specified in the approval notice.
  • After the measurement is completed, you will receive a measurement report.
  • You check the measurement report and submit it to the responsible authority on time.
  • You will receive a confirmation.

Processing time

There is no statutory processing time.

Fees

no

Legal remedies

No legal remedy is provided.

Legal basis

Section 26 Federal Immission Control Act (BImSchG)


https://www.gesetze-im-internet.de/bimschg/__26.html




Section 28 Federal Immission Control Act (BImSchG)


https://www.gesetze-im-internet.de/bimschg/__28.html




Technical Instructions on Air Quality Control (TA Luft)


https://www.verwaltungsvorschriften-im-internet.de/bsvwvbund_18082021_IGI25025005.htm

Address and contact information

Authority for the Environment, Climate, Energy and Agriculture

Corporate Environmental Protection

We have a limited number of customer parking spaces. To reserve a parking space, please contact our receptionist by e-mail at zugang@bsw.hamburg.de or by telephone on +49 40 428 40 - 50 50. Our working hours are: Monday to Thursday from 8:00 a.m. to 3:15 p.m , Friday from 8 a.m. to 1:30 p.m.

Haven't found the right one yet?

To Hamburg Service startpage

Keywords: ReSyMeSa discontinuous emission measurement LAI sample measurement report TA Luft Emissions report

Last updated: 16.02.2026