Detailed description
Filling points are systems that are permanently installed or used permanently at the same location and have a handling capacity of more than 1000 liters per hour. At filling points, transport containers are filled with flammable liquids with a flash point <23°C. This is a facility that requires monitoring.
You need permission from the relevant authority if you:
- would like to build and operate a filling station
- want to make changes to the design or operating method that affect the safety of the system
Permission may be granted to you subject to the following restrictions:
- limited
- limited
- under conditions
- with conditions
If the facility requiring a permit is part of a facility requiring a permit, no separate permit will be issued. Approval includes permission.